POPPUMP Puerto Rico Technical Center

Tel:(001)3474109611

POPPUMP logo

POPPUMP Puerto Rico Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

U310 Manual Nozzle

U310

U310 Manual Nozzle

For Heavy Duty, High-flow Truck stop, Bus and Fleet Service If you operate a full-service truck-stop, refuel your own fleet, or manage a card-lock refueling location, the low cost, long life and durability of the 120L high flow nozzle can help increase your productivity, sales and profits.

Warning

Do not use U303 Nozzles with a hold-open device on prepay self- service installations.Using foreign objects to hold-open automatic nozzles could result in failure to shut-off and personal injury.

Materials:

Body: Aluminum

seals: Buna-N, Viton

Main stem seals: Viton Cased Oil Seal / Graphite with Teflon

Main stem: Stainless steel

Color of insulator :

Red Green Blue Yellow Black

Features :

U303A/B Flow rate: 0-120L/m (113/16")

U303C/D Flow rate: 0-90 L/m (1")

Working Pressure: 0.18Mpa

U303 Automatic Nozzles for diesel, kerosene and all kinds of gasoline service.

Easily replaced spout- simply remove the screw.

Spout kits are available from HONGYANG.

Even, smooth, spray pattern- minimizes diesel foaming and false shut-offs.

Three position hold-open device- one finger control of hold-open mechanism means easy setting of flow rate.

Full hand insulator- protects both nozzle and vehicle, and insulates users' hands.Available Colors- color chart on inside back cover

Dual poppet valves- easy to open nozzle against high pressure.

Spout retaining ring- adds extra measure in securing nozzle spout in fill pipe.

100% Factory Tested.

Replacement Parts:

Key Description

1 Spout 1''

2 Spout 13/16''

3 Full hand insulator

4 Lever

5 Lever assembly

6 Diaphragm assembly

7 Main valve assembly

Package:

Net Weight Cross Weight Dimension

16kg/case of 10 19kg/case of 10 45x40x32.5cm/case of 10

Important:

The products should be used in compliance with applicable country, province and local Laws and regulations. Products selection should be based on physical Specifications and limitations and compatibility with the environmentand materials to be handled. HONGYANG makes no warranty of fitness for a particular use. All illustrations and Specifications in this literature are based on the latest products information available at the time of publication,HONGYANG reserves the right to make changes at any time in price, materials. Specifications and models and to discontinue models without notice or obligation.

products links

links

technical archives

    ser. Axis of transducer is much flexible; installing damp seal could reduce the flexibility of shaft. Impotent spring of check valve make oil flow backward even after stop operation, which bring transducer rotating conversely. Pressure oil flow back to transducer, bring negative round. The double optical board has installed wrongly, making data jumping. Automatic stop failure as presetting volume First define which situation trouble occurred ---- in presetting volume or in presetting money. If the former is trouble, reenter unit price. If both trouble, it is need to replace new main board. Loudspeaker trouble In most case, loudspeaker is destroyed. The static voltage of SP terminal of loudspeaker is 0 V; if the data is 12V, maintainer needs to replace or repair both loudspeaker and main board. Damaged main board and wiring board also result in loudspeaker failure. Small flow lost before stop operation Much little adjusting volume of main valve; Control lead of main valve is incorrectly connected to relative position; Small flow rate is lost due to main board trouble. Stop failure as put down nozzle The silicon on control board is damaged. Switch has destroyed. Abnormal MT voltage leads to the trouble. Lack of phase in motor Lack of electric phase in motor makes alarm. Electric phase is absent in junction box. Creepage Inner winding of motor id damaged. Water pours into junction box or insulation decline. Outer wire is connected with the frame of fuel dispenser. fuel dispenser Creepage of inner electric circuit due to other reasons Reliable protective circuit and earthing aren’t set in fuel dispenser. Fuel dispenser’s creepage easily result in fire and body hurt accident. Only after solve the trouble can operate fuel dispenser. Article II Pipeline failure and maintenance No delivery or slow flow Filter net is jammed because of mud and sand, metal bits and waste. Cleaning filter net would deal with the trouble of loud noise and no delivery. Large amount of air flo fuel dispenser fuel dispenser

technical specification

    is continuous and:   5.2.4.3   � the wall below the nozzle boot is not less than IP67 downwards to the lower extremity of the wall containing the   nozzle boot;   -- - - ---   � the wall within 200 mm horizontally and 50 mm vertically upwards from the pocket is not less than IP54;   then on the other side of the wall there is no hazardous area due to the nozzle see Figures 4 5 and 6.   18       Dimensions in millimetres   -- - - ---   Key   1 Nozzle boot   Zone 1: category 2 equipment   Zone 2: category 3 equipment   Figure 4 Nozzle boot area front view   19       Dimensions in millimetres   fuel dispenser -- - - ---   Key   1 Nozzle boot   2 Non hazardous area   Zone 1: category 2 equipment   Zone 2: category 3 equipment   Figure 5 Nozzle boot area side view   20       fuel dispenser fuel dispenser

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    company in its peer group with average margins of 9.4% over the past 15 years. In 1999 Mr Ostling fought hard against a hostile bid by Volvo, a Swedish carmaker, and won when the deal was blocked by the EU s antitrust watchdog. Three years ago he rejected a previous advance by MAN. This could be the trickiest—and possibly the last—battle of his time at Scania. © 2006 . About sponsorship Semiconductors Buying time Sep 21st 2006 | NEW YORK From The Economist print edition Freescale gets engaged, but continues to flirt with other suitors IT WILL be less a love match than a marriage of convenience if the knot is eventually tied between Freescale Semiconductor, a chipmaking firm that used to be part of Motorola, and a consortium of private-equity firms led by the Blackstone Group. That, at least, is the obvious conclusion to draw from Freescale s insistence, as a condition of accepting the Blackstone club s $17.6 billion proposal, that it retain the right not only to say yes to any better offer that comes along within 50 days—but actively to solicit such a bid. Such a “go shop�clause, which if exercised would leave Blackstone and its partners with only a break-up fee of $300m for consolation, is becoming more common in merger deals between public companies, as boards seek protection against shareholder allegations of a stitch-up. But they are unusual in private- equity deals. Indeed, the Freescale exa fuel dispenser mple may have been the result of the firm s mishandling of two rival bidders. Its board was reportedly meeting to consider the offer by Blackstone, the Texas Pacific Group, the Carlyle Group and Permira Advisors when a rival bid came in. This was from a consortium led by Kohlberg Kravis Roberts (KKR), Bain Capital, Apax Partners and Silver Lake Partners, a pioneer in applying private-equity techniques to technology firms. By some accounts, the KKR consortium wanted Freescale to postpone its deci fuel dispenser fuel dispenser